BUILDING SAFETY ACT COMPLIANCE
Build the Gateway 3 evidence while you build the building
Sablono embeds your approved requirements, hold points and sign-offs into the delivery sequence itself. Every inspection, photograph and approval is captured against the unit as the work happens.
By the time you apply for the completion certificate, the construction record is already assembled — structured, attributed and exportable.
Gateway 3 doesn't fail on the building. It fails on the records.
Four things Sablono does that Gateway 3 asks for
Your approved requirements, attached to the sequence
Map the Gateway 2 details, ITPs and hold points onto your workflow once. Every unit inherits the same checks the moment it enters the programme, on the current revision — so the check the trade sees on level 14 is the check the approval asked for.- One standard applied across every trade, level and block
- Versioned, so nobody works from a superseded detail
- Reusable on the next scheme, not rebuilt from scratch
Concealed work gets photographed, because it can't be covered otherwise
Firestopping, penetrations, cavity barriers, waterproofing. Reaching the state triggers the inspection, and until it passes with its photographs attached, the follow-on activity stays closed. This is the evidence that cannot be recovered later at any price.- Geo-tagged, timestamped, attributed to the person who checked it
- Captured on the tools, in the room, against the live requirement
- Filed against the unit and the activity, not a folder of loose images
Make compliance demonstrable
Capture inspections, evidence, approvals and accountability as work happens — creating the records you need to demonstrate compliant delivery.Every deviation carries a reason and an author
A departure from the approved requirement is raised as an issue against the activity, routed to the trade responsible, and closed only when someone with authority has reviewed the fix. The change control log builds itself out of work people were already doing.- Verified closure, not the trade marking its own defect resolved
- Rejections and their reasons stay attached to the record
- No verbal agreements that leave nothing behind
We built Sablono to carry the golden thread
Real-time oversight shows exactly what’s complete and what’s still missing.
Every check, photograph, defect and signature is stamped to a unit, an activity, a person and a time, in one connected record. Export per unit, per level or per building — with the evidence already attached.
When the regulator, the accountable person or a claim asks what happened in Apt 1303, the answer is one filter away, and it is defensible.




Why run Gateway 3 evidence in Sablono
Without Sablono
Evidence collated in the last eight weeks
Photos out of four phones, sign-offs out of three inboxes, gaps nobody can close.
Concealed work never photographed
Covered before anyone inspected it, and unevidenced without opening up.
Nobody can say what is outstanding
Readiness is a hand-maintained spreadsheet, wrong by Wednesday.
Declarations signed on trust
Dutyholders sign backed by what they hope was done properly.
Using Sablono
The record closes as each unit does
Every approval writes to the pack as it lands, unit by unit.
The hold point stops the cover-up
No inspection, no photographs, no release of the follow-on trade.
Readiness is a live figure
Which units are evidenced, what is missing, and who owes it — today.
Declarations signed on evidence
A record you can open in front of the regulator, line by line.
Is Sablono right for you?
Tell our AI about your project and goals and get instant answers on how Sablono can help.
Key features
How companies like yours stay protected with Sablono

Bringing quality and project delivery into one connected digital workflow across 10+ projects in just 6 months
Read More
Connecting site teams, quality processes and real-time project data in one platform
Read More
Creating a complete quality audit trail across a 295 MW solar portfolio with 539,800 panels
Read More
Replacing manual processes with digital quality workflows that connect teams from inspection to handover
Read More.png?width=287&height=287&name=social%20post%204%20(5).png)

.png?width=287&height=287&name=social%20post%201%20(1).png)