Catch quality issues before they become rework
A quality issue might start small. It becomes expensive when the next trade builds on top of it.
Sablono puts inspections, Hold Points and sign-off into the flow of work, helping teams catch problems before work moves on.




The same defect. A very different cost.
Imagine one unsealed penetration. The defect doesn't change. What changes is how much work has happened before someone finds it.
| Found immediately | By next trade | At handover | After occupation |
| Fix it while the crew and materials are still there | Reopen completed work and bring trades back | Remove finishes and delay handover | Remediate occupied work and establish responsibility |
The earlier you catch it, the less there is to undo.
Catch problems while they're still easy to fix
Quality gates before work moves on
Require critical work to be inspected and approved before the next activity is released. Teams can see when work is ready and when they need to wait.Problems are resolved while the responsible trade, materials and access are still available.
Close the loop when something isn't right
Raise issues directly against the work, assign them to the responsible trade and track them through resolution, re-inspection and sign-off.The issue isn't finished just because someone says it's fixed.
Stop fixing instances. Fix the cause.
When the same issue keeps appearing, fixing each defect individually isn't enough.
Analyse issues by trade, activity, location and type to identify recurring patterns - then address the cause before the same problem is repeated across the project.
.png?width=300&name=TRACKTrace%20LP%20(4).png)
“What truly impressed us about Sablono was how effortlessly it gives us full traceability over every detail of our projects. It’s rare to find a system that’s this powerful yet so easy for our teams to use. It’s rapidly transforming how we track progress, resolve issues, and keep everyone aligned.”
Jean-Baptiste Lugger Construction Manager, FT Construction
.png?width=300&name=TRACKTrace%20LP%20(2).png)
.png?width=300&name=Copy%20of%20QA%20LP%20(15).png)
.png?width=300&name=TRACKTrace%20LP%20(3).png)
%20(8).png?width=290&name=Copy%20of%20QA%20LP%20(290%20x%20256%20px)%20(8).png)
Spot issues before they become problems
FAQs
Wherever the work is about to be covered up, and wherever a following trade inherits the condition. Firestopping, penetrations, cavity barriers, waterproofing and pre-close inspections are the usual first four, and they tend to pay for the whole exercise.
.png?width=287&height=287&name=social%20post%204%20(5).png)
