Skip to content
Close
PROGRESS AND WORKFLOWS

Activity Tracker

Replace your static spreadsheet tracker


Visual Tracker

Automatically visualise your drawings


Mobile App

Report progress easily in the field


Automated Handover Notifications

Send notifications to trades' mobile devices


Deliverables List & Reports

See and share all deliverables in one report


Workflow Templates

Build repeatable process workflows


Process Audit Trail

Stay protected with a digital progress record

 

QUALITY AND COMPLIANCE

QA Checklist

Capture quality data in the moment


Activity Sign-off

Get notifications when work is completed


Issue Sign-off

Get notifications when issues are flagged


Issue List & Reports

See and share all issues in one report


Issue Templates

Build repeatable issues workflows


Photo Documentation

Stay compliant with geo-tagged photos


Quality Audit Trail

Stay protected with a digital quality record

 

PAYMENT VALUATION AND INTELLIGENCE

Commercial Dashboard

Link costs directly to your site activities


Commercial Look-Ahead

See forecasted costs from your programme


Commercial Planned Works Valuation

Easily valuate actual achieved planned works


Baseline Scheduling

Transform your baseline into a production plan


Look-Ahead Planning

Update look-ahead plan based on data


Planned vs Actual Dashboards

Understand & adapt plan based on data

 

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

MORGAN SINDALL CONSTRUCTION

Data Insights Drive Efficiency and On-Site Productivity

Manor_Road_-_CGI_3_-__EPR_Architects_1.min-800x600

Saving Morgan Sindall Construction 10,000+ Project Hours

Leading British construction company Morgan Sindall Construction took on 300 Manor Road - a complex residential project comprised of three residential towers. They partnered with Sablono to boost on-site productivity, drive decision-making and improve collaboration between trades. 

Project Overview

300 Manor Road is comprised of 355 new build apartments across three residential blocks in Canning Town, East London. The contract duration is two years (Aug 2022-July 2024) and involves circa 50,000 individual construction activities.  

Morgan Sindall - 300 Manor Road 4
ABOUT MORGAN SINDALL CONSTRUCTION

Morgan Sindall Construction is part of Morgan Sindall Group plc, nine businesses who specialise in all elements of the built environment – construction, infrastructure, fit out, property services, housing, regeneration and development.

The Challenge

300 Manor Road’s scale and site constraints mean that the project is especially difficult to coordinate efficiently and effectively. Tangible, real-time understandings of the site and associated key performance indicators are difficult to derive, manage and optimise. 

Morgan Sindall Construction wanted to: 

  • Obtain site analytics and derive KPIs to optimise processes. 

  • Document relevant site data with ease of access for all relevant parties. 

  • Gain a comprehensive real-time understanding of site performance. 

  • Undertake more agile planning centred around a comprehensive, real-time understanding of the site. 

Morgan Sindall - 300 Manor Road 6
“We needed a solution that would help us improve confidence with business stakeholders by ensuring all relevant details were fully documented. We needed the ability to derive KPIs and real time site data so that we could actively drive operational efficiency and on-site productivity.”
David WilliamsSenior Project Manager

The Solution

Morgan Sindall Construction needed a solution that would provide them with a better understanding of what was happening onsite. Sablono provided:
         
Data insights 
Sablono provided the project team with the ability to accurately capture any relevant site data in a single system and connect this with Power BI models to drive automated insights. The project team were thus empowered to be able to track their performance and deep dive into their production data to optimise the jobsite. 
 

Visual tracking 
Sablono provided visual tracking of highly complex elements to assist in better understanding the project and improving collaboration. Site drawings were converted into automated visual trackers that updated in real-time to give a clear view of the project’s progress. 
 

Real-time tracking and Lean Planning 
Sablono unlocked real-time tracking of tens of thousands of activities across the project team, subcontractors and supply chain. Morgan Sindall Construction were able to track the project down to the most granular detail and filter by area, status, deliverable and team. This equipped the team to be able to plan ahead with greater agility.

 

Morgan Sindall - 300 Manor Road 2

"Sablono has been a game changer for us. We’ve been able to gain a better understanding of the site in real-time and collaborate more effectively between trades. The result was a significant improvement in our productivity rates and a greater ability to optimise our processes. Overall, we’re thrilled with the outcomes.” 

Sam Breaks

Senior Site Manager, Morgan Sindall Construction

 

Discover Sablono for your next project

Ready to drive productivity, streamline your processes and get the insights you need to take your success to the next level? 

The Results

Sablono provided the 300 Manor Road team with the visibility and key performance metrics they needed to optimise their processes and drive greater efficiency.

6000+ hours saved on documentation 

1000+ hours saved on inspection times 

  Weekly meetings halved saving 3000+ hours 

 

Discover Sablono for your next project

Project success made simple.