Skip to content
Close
PROGRESS AND WORKFLOWS

Activity Tracker

Replace your static spreadsheet tracker


Visual Tracker

Automatically colour-code designs & drawings


Mobile App

Report progress easily in the field


Automated Handover Notifications

Send notifications to trades' mobile devices


Deliverables List & Reports

See and share all deliverables in one report


Workflow Templates

Build repeatable process workflows


Process Audit Trail

Stay protected with a digital progress record

 

QUALITY AND COMPLIANCE

QA Checklist

Assure quality and build Right First Time


Activity Sign-off

Get notifications and sign-off trades' work


Issue Sign-off

Get notifications when issues are flagged


Issue List & Reports

See and share all issues in one report


Issue Templates

Build repeatable issues workflows


Photo Documentation

Stay compliant with geo-tagged photos


Quality Audit Trail

Stay protected with a digital quality record

 

PAYMENT VALUATION AND INTELLIGENCE

Commercial Dashboard

Link costs directly to your site activities


Commercial Look-Ahead

See forecasted costs from your programme


Commercial Planned Works Valuation

Easily valuate actual achieved planned works


Baseline Scheduling

Transform your baseline into a production plan


Look-Ahead Planning

Update look-ahead plan based on data


Planned vs Actual Dashboards

Understand the performance of all teams

 

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

Q ENERGY

Q ENERGY Gains Full Visibility Across 295.60 MW Solar Portfolio of 539,800 Panels

q energy case study

Helping Q ENERGY gain 100% transparency across their projects 

Making breakthroughs in sustainable, green energy, Q ENERGY partnered with Sablono across their portfolio of projects to exchange paperwork and manual processes for an automated system that helped them to better visualise progress and quality data.

Project Portfolio

With smartly positioned sun-chasing trackers, Q ENERGY’s projects are maximising energy production and working to help bring about both environmental and economic change. Despite this, the company saw an opportunity within their own processes to create better ways of working. 

Q ENERGY is currently using Sablono for seven active construction projects across Europe. This portfolio comprises over 539,990 solar panel modules with a total output of 296.60 MegaWatts (MW).  
 

photovoltaic industry case study

The photovoltaic industry realised that they need to become digital as a standard. Q ENERGY was not the first to embark on the digital journey, but we are certainly the pioneers in executing it on this level of detail.”

 
Muhammet Zeyrek

Construction Manager, Q Energy

ABOUT Q ENERGY

Q ENERGY Europe GmbH is Europe’s green provider of renewable energy project solutions for all future-ready and eco-conscious clients – a trustworthy partner for communities and land owners, project developers and construction professionals, investors and off-takers. 

The Challenge

Q ENERGY anticipated that clients would start demanding more and more detailed project documentation. They wanted to stay ahead of this, but their existing processes prevented this, which posed a significant risk. 

Additionally, the use of manual Excel trackers led to high overhead costs and time being wasted on non-value-added tasks. Meanwhile, traditional pen and paper quality checks raised management costs and introduced warranty risks. 

Siloed projects, fragmented supply chain communication, and analogue reporting further added to Q ENERGY’s challenges, making it difficult to understand project status and increasing the risk of errors and delays. 

Q ENERGY was on a mission to: 

Increase the visibility of progress and quality, not only with the site office but also with the head office in Berlin. 

Be able to update progress from the site in real-time. 

Digitise all workflows and replace Excel and email communication.  

Create a full-audit trail of everything that was happening on site. 

Improve collaboration – contractors needed to be able to upload progress and documentation and  Q ENERGY needed to be able to confirm work from contractors. 

Have a central system to store quality documents

Have a digital system to collaborate with O&Ms upon completion of the construction phase. 

q energy case study
"Clients are demanding more and more documentation at the end of projects, and the lack of paperwork created significant risks for Q ENERGY. We needed a system that would allow us to document everything, while being easy to use"
Muhammet ZeyrekConstruction Manager, Q Energy

The Solution

QENERGY needed a transformative solution to improve data transparency across their projects. Here’s how Sablono helped:  
 

Real-time, accurate progress tracking 

Sablono provided Q ENERGY´s teams visual tracking of complex elements which supercharged overall project clarity.  

On top of this, real-time, automated tracking allows the company to monitor and streamline progress continuously. Q ENERGY can track their projects down to the most granular detail and filter by area, status, deliverable and team to understand the true status and easily communicate this with the wider team. 

 

A centralised, digital platform 

Sablono centralised all of Q ENERGY’s progress and quality information. The user-friendly mobile app also replaced manual paperwork and email which helped facilitate rapid adoption throughout the supply chain. 

Centralised progress reports in both visual and tabular formats, along with daily logs, enhanced transparency and communication, while centralised project control dashboards, which are automatically refreshed via Rest API, allowed for the discovery of project trends in real-time. 

 

Semi-automated quality management system 

Q ENERGY used Sablono’s process templates to predefine and standardise their quality workflows for greater repeatability. Additionally, the ability to attach digital QA checklists, notes and photos right in the Sablono app helped ensure all quality data was recorded and completed to the right standard before sign-off. 

All the data collected from the very beginning of each project was stored to generate a fully accountable digital audit trail of everything that happened onsite, which management could easily download and share with stakeholders.  

 

"If I had stuck with Excel alone, managing projects of this size, let alone simultaneously, would have been nearly impossible. Sablono offers an exceptionally high level of control, allowing me to monitor every aspect. For instance, I can instantly check the status of each individual trench in my project."

Muhammet Zeyrek

Construction Manager, Q Energy

q energy case study

“Our workflows of quality control and progress monitoring have been hugely enhanced by Sablono’s capabilities. The platform provided Q ENERGY not only with operation efficiency, but also with an essential audit trail to mitigate against future claims and it also made real-time quality documentation and progress monitoring our standard."

Claudio Schlageter

Team Leader, Project Management, Q Energy


The Results

Sablono’s real-time progress insights gave Q ENERGY a deeper and more accurate understanding of their project which helped them to complete tasks faster with fewer errors. 

Instant access to progress and quality data meant that the company were able to increase the speed of decision-making and use insights to optimise going forward. 

Streamlining paperwork and manual processes also gave Q ENERGY back precious time that they could allocate to more value-adding tasks.

40% reduction in time spent performing inspections & updating progress reports 

100% transparency on status of all work across their projects  

 Saved manpower of 2 full-time roles per project 

 

"Sablono helps us to drastically reduce paperwork and efficiently tracks all essential information throughout the construction process. It also aids in monitoring open quality issues and enables the on-demand creation of Punchlist reports for specific scopes of work at any time."

 
Muhammet Zeyrek

Construction Manager, Q Energy

"If I had stuck with Excel alone, managing projects of this size, let alone simultaneously, would have been nearly impossible. Sablono offers an exceptionally high level of control, allowing me to monitor every aspect. For instance, I can instantly check the status of each individual trench in my project."

 

Discover Sablono for your next project

Ready to drive productivity, streamline your processes and get the insights you need to take your success to the next level? 

Discover Sablono for your next project

Project success made simple.