Skip to content
Close
PROGRESS AND WORKFLOWS

Activity Tracker

Replace your static spreadsheet tracker


Visual Tracker

Automatically colour-code designs & drawings


Mobile App

Report progress easily in the field


Automated Handover Notifications

Send notifications to trades' mobile devices


Deliverables List & Reports

See and share all deliverables in one report


Workflow Templates

Build repeatable process workflows


Progress Audit Trail

Stay protected with a digital progress record

 

QUALITY AND COMPLIANCE

QA Checklist

Assure quality and build Right First Time


Activity Sign-off

Get notifications and sign-off trades' work


Issue Sign-off

Get notifications when issues are flagged


Issue List & Reports

See and share all issues in one report


Issue Templates

Build repeatable issues workflows


Photo Documentation

Stay compliant with geo-tagged photos


Quality Audit Trail

Stay protected with a digital quality record

 

PAYMENT VALUATION AND INTELLIGENCE

Commercial Dashboard

Link costs directly to your site activities


Commercial Look-Ahead

See forecasted costs from your programme


Commercial Planned Works Valuation

Easily valuate actual achieved planned works


Baseline Scheduling

Transform your baseline into a production plan


Look-Ahead Planning

Update look-ahead plan based on data


Planned vs Actual Dashboards

Understand the performance of all teams

 

Deliverables Dashboard

High-level milestones overview

 

Quality Dashboard

Spot quality issues and trends proactively

 

Run Rate & Performance Dashboard

Track team performance against the plan

 

Activity Drilldown

Identify challenges before they escalate

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

FEATURED

Heading

Use Sablono to minimise defects, get to the root cause of quality issues and streamline your workflows to get it right first time.

The better QA system

quality in construction - Sablono
Oletta Stewart16-Aug-2022 18:52:5812 min read

Achieving Quality in Construction




Achieving consistently high-quality project outcomes
 was once only realistic if you had an excess of budget and time. Not anymore. If you are a leader in construction looking for ways to achieve quality in construction projects, this article is for you.

In this article, we’ll share everything you need to know about quality in construction as well as the practical takeaways that will help you to significantly boost quality on projects. Let's dive in…

What is quality in construction?

"The term ‘quality’ in construction is defined as when a project exceeds or meets the Scope of Work guidelines set by the owner or the client. This is the roadmap that is there to ensure that a project is on track to success."

You can learn more in this article: Construction Quality Management Explained.

What are the costs of poor quality?

Quality is a hot topic in construction and there’s good reason for this. Some of the implications for poor quality projects include the following:

 

Poor quality drains resources

Did you know that a typical residential project containing 500 units, has at least one quality issue per apartment? The impact that the time and labour needed to resolve these issues has on the bottom line should not be underestimated. 

In short, quality issues = time and money. Getting it right the first time will help you to deliver projects more seamlessly while holding on to more profits. 

 

Poor quality leads to safety issues

 

Safety and quality are interconnected. Poorly executed work is more likely to give rise to safety issues. The Grenfell Tower fire acts as a reminder of the devastating effects of construction projects that fail to keep quality in mind.  

With new legislation around the Building Safety Act demanding the Principal Contractor to manage building safety risks, with clear lines of responsibility during the design, construction and completion of all buildings, this is something that will now be a requirement on projects.

Note: Looking for a simple way to create the golden thread on projects and adhere to the Building Safety Act while improving the bottom line? Sablono can help. Learn more here. 

 

Poor quality causes harm to the environment

The construction industry’s carbon output is expected to only grow over the next 30 years. Defective work leads to wasted material, extra manual labour, materials and extra fuel - all of which cause major harm to the environment. 

The Net Zero Carbon Buildings Commitment is new legislation that requires the construction industry to take the issue of decarbonisation more seriously by promoting smarter, more sustainable ways of working. 

 


 

Quality mistakes to learn from

 

 

1. Reactive quality management

It's standard practice to carry out snagging at the end of a project, but this approach is reactive, simply ‘documenting the car crash’ instead of stopping the car crash from happening in the first place. Taking a proactive approach by getting to the root cause of quality issues so you can prevent them from reoccurring is key. 

{Note: We created an article that goes into this in more detail: Proactive Construction Defect Management.}

2. Using low-quality materials

Using low-quality materials quickly gives rise to leaking, damage, cracks, and toxic moulds. Around 45 million buildings in the US have high levels of mould, with 93% of chronic sinus infections directly attributed to mould exposure. It may initially appear as a cost-saving opportunity, but in the long term, the costs far outweigh the benefits.

 

3. Lack of site supervision

In most instances, constant supervision across a big site is impossible. Without a good construction project management software solution to help track and report everything that takes place across the day-to-day construction site, many obvious quality issues go unnoticed.  

4. Lack of quality control

All work and materials within a project have to be appropriately managed by a quality controller. Failing to put the proper people and processes in place to look over this can lead to major financial losses.

5. No project auditing

Audits are used to determine the success of construction work - this includes quality, project internal, and pre-selection audits. These all help to monitor the project's performance and ensure that it remains within the original scope of work. Without such audits, it becomes extremely difficult to spot defects and mistakes before the project is completed.


6. Absence of the golden thread

To ensure quality projects, it’s crucial that all of the tasks and activities that make up the project are clearly documented. Failing to do this makes it difficult to have peace of mind that all work has been completed to the proper standard. It also means that if any claims are raised due to quality issues, you have nothing to serve as proof. 


7. Absence of project objectives

Every construction project must have clearly stated objectives before work is executed. Besides preventing disputes, construction objectives also ensure that projects run smoothly. An absence of project objectives disrupts all functions and makes work difficult.


8. No defined goals or standards 

Defining goals helps to ensure that everyone involved in a project understands the vision, while creating standards communicates how work should be completed in order to achieve the vision. Failure to define objectives and standards will lead to poor quality work that strays away from the original plan. 


How to improve quality in construction

1. Establish quality objectives

If you haven't already, you should clearly define the quality objectives of the project. Below is an example of objectives you may set out: 

  • Completion of the project within the stipulated time and budget.
  • No accidents.
  • All tasks completed right the first time without having to re-do work.
  • At least 85% of on-site activities are documented.
  • All materials meet local legislative requirements.
  • The project to the contract specifications of the project. 

To avoid miscommunication, objectives set for a project must be mutually agreed on by both the owner or the client and the management of the project. 

The following are the factors that should be considered when putting objectives in place to achieve better quality projects:

  • The time and funding available for the project.
  • Existing corporate or local government policies. 
  • The key requirements of the construction project.
  • The critical requirements of the stakeholders involved in the project.
  • Other requirements set by external bodies (e.g. Historic England, the Design Council Cabe).
  • Local and planning legislation.

 

2. Create standards

Establishing clear standards for each activity type not only helps you to complete projects faster, it will also ensure that all work completed is held to a standard that is in line with your wider quality objectives.

Utilising a digital construction quality management system that allows you to define the sequences of works that goes into each task to promote consistent best-practice, and then easily communicate these standards with everyone working on a project is key.

This can be as complex as creating a sequence to standardise your apartment fit-out process, or as simple as a 6-step façade sequence. 

3. Establish quality processes and measurements

The construction workflow should be strictly controlled by conducting continuous tests and inspections before, during and after the construction project.

Setting up quality measurements in your construction projects mainly comes down to two factors - Quality Assurance and Quality Control.


Quality assurance (QA) checklists

Quality assurance in construction not only considers the project's final result but also implements a process-oriented approach. Therefore, it considers the systematic and planned activities executed during a job to fulfil the quality requirements of a project. 

Utilising digital quality assurance checklists will help you to assess the entire project workflow. You should look at answering questions such as ‘how many issues were reported across the project?’, ‘how long did it take for quality issues to be resolved?’ and ‘on average how long did each subcontractor take to rectify quality issues’. 


{Note:
We created a free customisable quality control checklist template you can download to use on your projects. Get your templates here: Construction Quality Control Template}
  


Quality control (QC) 

On the other hand, quality control in construction is more product-oriented and is concerned with the final outcome of a construction project. 

Procedures involved in quality control:

  • It examines if a job has been correctly accomplished and if it was completed according to the contractual guidelines and requirements. 
  • QC measures the quality characteristics of the completed job and compares it to the project standards already agreed upon. 
  • It also analyses the differences (if any) between the desired and the obtained results of the project to understand if any corrections are required.

As with construction quality assurance, utilising a digital construction tool to measure this will make this so much more simple.


4. Site audits

Employing independent third parties or owners within a project to conduct regular audits across your construction site is a good option to maintain high quality.

There are mainly three elements of quality that need to be kept in mind when conducting site audits:

1. Quality characteristics

Quality characteristics include attributes like strength, texture, height, colour, and dimensions of the construction project. It is related to the attributes concerning which quality control procedures are judged. Quality characteristics consider parameters like the practical usability of concrete in a slump or its compressive strength. 

2. Quality design

It refers to the quality with which the project has been designed. It involves meeting the client's design standards and creating a design that is maintainable and sustainable.

3. Quality conformance

Quality conformance refers to the project confirmation rate to the original contract and specifications. 

Note: Sablono makes project audits simple. You no longer have to rely on third parties or site walks to get an accurate picture of your projects. Subcontractors use the platform to report progress, flag issues, submit QA assessments, photos of work and more. Project managers get instant notifications pushed to their devices when work has been submitted. They can assess this against pre-defined standards, easily spot quality issues and approve or reject work. Get a personalised demo here


An easy way to improve quality on projects

Sablono is a construction project management solution that provides a complete digital audit trail that helps to ensure quality is kept at the forefront of your projects.

From the company executing work, QA assessments, the time of sign-off, who signed off, photos and more – Sablono makes it quick and easy to keep track of thousands of activities and retrieve quality data in moments. Plus, this audit trail runs for decades to provide on-demand access to data whenever you need it. 

Here’s how Sablono can help you achieve better project outcomes:

Hero - 4 devicesBefore Sablono, trades would rely on printing paper QAs and communicating through paperwork and email. This is very admin-heavy and can lead to errors and mismatched data. Sablono provides a fully digital quality management system it stores all quality-related documents and simplifies processes.

Learn more about how Sablono helps with quality assurance here.


Attach digital checklists directly to activities

attach qa checklist

In construction projects, it’s common for trades to sign off a project with key criteria missing and without evidence that the job has been completed up to standard. With Sablono, digital QA checklists are directly linked to units. Before a task can be signed off, trades first have to fill out the relevant information and include the corresponding picture as evidence. This gives reliable evidence that all elements of the project have been completed to a high standard.

You can learn more about this feature here: QA Checklists


See all your quality data in one place

Activity Tracker _ Sablono

Before Sablono, projects required manual checks via site walks to make sure the project was up to standard. Sablono digitises this process to give a birds-eye-view of a project without even having to go on-site so that you always know what issues need to be fixed.

Activity Tracker allows you to see what tasks are in progress and finished to give greater visibility, while Issue Lists and Reports allow you to see all issues raised in place to streamline their resolution. You can even attach geo-tagged photos directly to your activities or QA items as evidence of quality and compliance standards being met.

 

Get an automated quality audit trail

Digital audit trail

Imagine having a fully accountable, connected digital audit trail of all quality-related data at your fingertips. By attaching notes, photo documentation and QAs directly to activities in Sablono, teams create an automated record of every quality aspect. This trail gives you a detailed view of project happenings, right down to who did what and when. 

This provides you with an undisputable record for claims management, boosting accountability and helping you pinpoint the root of any quality issues.

 

Integrate your quality, progress and cost

Report from phone to computer

Thanks to the unique combination of progress, quality and cost on one central platform, with Sablono, you can quickly analyse the implications of defects and hold-ups in your process instantly.

Analyse sign-offs, ITPs, defects and hold-ups. Gain insights into root causes for recurring quality problems and analyse lead times for resolving defects and sign-offs so you’re constantly improving. 


Standardise your quality workflows

Predefined quality workflows

Get everyone on a project reporting information and carrying out activities in the same way. Create clear quality standards. Have complete control over the framework and structure - ask trades the same questions, and review their work in the same manner.

Sablono's Issue Templates and Workflow Templates allow you to standardise processes across the project to prevent mistakes and streamline project workflows. Over time collect data and insights around the best practices and expected timing for projects to be delivered based on past work. 


Collaborative quality management

Get notified when work is ready - new updated

For extra peace of mind, you can also build Activity Sign-off and Issue Sign-off into your workflows to ensure that all work gets final approval from management before it's signed-off.

You can also generate automated PDF quality reports and export them in moments to quickly share issues with your project partners. 

 

Conclusion: improve construction quality on your next project

With the right technology, improving the quality in construction projects can be easy. Sablono was built to minimise defects, get to the root cause of quality issues and streamline your workflows to get it right first time.

To discover how Sablono can help your future projects,
schedule a personalised demo here