Skip to content
Close
PROGRESS AND WORKFLOWS

Activity Tracker

Replace your static spreadsheet tracker


Visual Tracker

Automatically visualise your drawings


Mobile App

Report progress easily in the field


Automated Handover Notifications

Send notifications to trades' mobile devices


Deliverables List & Reports

See and share all deliverables in one report


Workflow Templates

Build repeatable process workflows


Process Audit Trail

Stay protected with a digital progress record

 

QUALITY AND COMPLIANCE

QA Checklist

Capture quality data in the moment


Activity Sign-off

Get notifications when work is completed


Issue Sign-off

Get notifications when issues are flagged


Issue List & Reports

See and share all issues in one report


Issue Templates

Build repeatable issues workflows


Photo Documentation

Stay compliant with geo-tagged photos


Quality Audit Trail

Stay protected with a digital quality record

 

PAYMENT VALUATION AND INTELLIGENCE

Commercial Dashboard

Link costs directly to your site activities


Commercial Look-Ahead

See forecasted costs from your programme


Commercial Planned Works Valuation

Easily valuate actual achieved planned works


Baseline Scheduling

Transform your baseline into a production plan


Look-Ahead Planning

Update look-ahead plan based on data


Planned vs Actual Dashboards

Understand & adapt plan based on data

 

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

FEATURED

Track Free 1200x1200

Sablono Track Free replaces your existing spreadsheet tracker for simple progress reporting on-site.

Try it for free

Oletta Stewart19-Jun-2023 18:59:534 min read

Part L Building Regulations U Values (2023 Amendments)

When it comes to energy efficiency, U-values play a crucial role in Part L compliance. Part L sets specific targets for U-values, which are the maximum allowed heat transfer rates for building elements like walls, roofs, windows, and doors.

These targets ensure that these components meet minimum insulation standards, reducing heat loss or gain.

We've collated the latest recommended U-Values straight from Appendix B of Approved Document L Volume 1 (with 2023 amendments)

Skip to:

 

Part L Building Regulations U Values

Disclaimer: These U-values provide general guidance, but it's important to refer to the most recent version of Part L and any associated documents, as well as consult with building professionals, architects, or local building control authorities to ensure compliance with specific project requirements.


Summary of notional dwelling specification for new dwelling:


Element or system


Reference value for target setting

Opening areas (windows, roof windows, rooflights and doors)

Same as for actual dwelling not exceeding a total area of openings of 25% of total floor area

External walls including semi-exposed walls

U = 0.18 W/(m²·K)

Party walls

U = 0

Floors

U = 0.13 W/(m²·K)

Roofs

U = 0.11 W/(m²·K)

Opaque door (less than 30% glazed area)

U = 1.0 W/(m²·K)

Semi-glazed door (30–60% glazed area)

U = 1.0 W/(m²·K)

Windows and glazed doors with greater than 60% glazed area

U = 1.2 W/(m²·K) Frame factor = 0.7

Roof windows

U = 1.2 W/(m²·K), when in vertical position

Rooflights

U = 1.7 W/(m2·K), when in horizontal position (for correction due to angle, see specification in SAP 10 Appendix R)

Get this sent to your inbox: Download summary


U-values for party walls:

Party wall construction

U-value W/(m2·K)

Solid

0.0

Unfilled cavity with no effective edge sealing

0.5

Unfilled cavity with effective sealing around all exposed edges and in alignment with insulation layers in abutting elements

0.2

A fully filled cavity with effective sealing at all exposed edges and in alignment with insulation layers in abutting elements

0.0

Get this sent to your inbox: Download summary

 

Part L Buildling Regulations guide


Limiting U-values for new fabric elements and air permeability in new dwellings:


Element type


Maximum U-value  W/(m2·K)

All roof types

0.16

Wall

0.26

Floor

0.18

Party wall

0.20

Swimming pool basin

0.25

Window

1.6

Rooflight

2.2

Doors (including glazed doors)

1.6

Air permeability

8.0m3/(h·m2) @ 50Pa

1.57m3/(h·m2) @ 4Pa

Get this sent to your inbox: Download summary

Limiting U-values for new fabric elements in existing dwellings:


Element type


Maximum U-value  W/(m2·K)

Roof

0.15

Wall

0.18

Floor

0.18

Swimming pool basin

0.25

Window

1.4 or Window Energy Rating  Band B minimum

Rooflight

2.2

Doors with >60% of internal face glazed

1.4 or Doorset Energy Rating  Band C minimum

Other doors

1.4 or Doorset Energy Rating  Band B minimum

Get this sent to your inbox: Download summary



Limiting U-values for existing elements in existing dwellings:

Element

U-value  W/(m2·K)

 

(a) Threshold

(b) Improved

Roof

0.35

0.16

Wall–cavity insulation

0.70

0.55

Wall – internal or external insulation

0.70

0.30

Floor

0.70

0.25

 

Frequently asked questions: 

What are Part L U-values?

U-values measure the rate of heat loss through building elements like walls, roofs, and windows. They are crucial in ensuring buildings meet the required energy efficiency standards set by Part L Regulations.

How can I improve U-values in windows to comply with Part L Regulations?

To improve U-values in windows, consider using double or triple glazing, low-E coatings, and insulated window frames. These improvements can help you meet the U-alue targets set by Part L Regulations.

Do Part L Building Regulations U-values apply to all types of buildings?

Part L Building Regulations U-values apply to all new residential and commercial buildings in the UK. They are designed to ensure that all constructions meet minimum energy efficiency standards.

What happens if my building does not meet the U-value requirements of Part L Regulations?

Failure to meet the U-value requirements of Part L Regulations can result in non-compliance with building regulations, leading to penalties and difficulties in obtaining necessary certifications for the building.

Are there any exemptions to the U-value targets in Part L Building Regulations?

Some historic or special buildings may be exempt from certain U-value requirements in Part L Building Regulations. However, it is essential to check with local authorities or building control for specific exemptions.

How often are Part L Building Regulations U-values updated?

Part L Building Regulations are subject to periodic updates to align with advancements in energy efficiency standards and technologies. It is advisable to stay updated with the latest regulations to ensure compliance.

Where can I find more detailed information about Part L Building Regulations U-values?

For more detailed information about Part L Building Regulations U-values, you can refer to the official government website, energy efficiency guides, or consult with building professionals specialising in compliance with building regulations.

RELATED ARTICLES